320 Post Road
Fully Leased
Specifications
Year Built:
1978
Remodeled:
2019
Construction:
Structural Steel With Masonry Build
Floors:
Polished Concrete Poured Over a Metal Deck
Heating & Cooling:
High efficiency gas package rooftop system with ECM multi-stage heating and cooling, automatic fresh air economizers, new natural gas furnace and energy efficient upgrades in cooperation with Eversource’s Energy Efficiency Program.
Security:
24/7/365 Key Card Access with Managed Security
Life Safety:
New Addressable Fire Alarm System
Fully Sprinkled Facility
Electrical System:
1,600 Amps, 120/208 Volt, 3-Phase, 4- Wire
All new LED fixtures in Cooperation with Eversource Energy Efficiency Program
Elevators:
2 Overhead Traction Elevators Serving All Floors
Rest Rooms:
ADA Compliant Fully Renovated Multi-stalled Bathrooms Per Floor
Parking:
Ratio: 3.3/1,000 SF +/-
Column Spacing:
30’-0” x 25’-0” on Center